Campbell-scientific CR3000 Micrologger Uživatelský manuál Strana 266

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 590
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 265
Section 7. Installation
266
Figure 82: PT100 in three-wire half-bridge
CRBasicExample60. PT100inThreewireHalfbridge
'See FIGURE. PT100 in Three-Wire Half-Bridge (p. 266) for wiring diagram.
Public Rs_Ro
Public Deg_C
BeginProg
Scan(1,Sec,0,0)
'BrHalf3W(Dest,Reps,Range1,SEChan,ExChan,MPE,Ex_mV,True,0,250,100.93,0)
BrHalf3W(Rs_Ro,1,mV50,1,Vx1,1,4400,True,0,250,100.93,0)
'PRTCalc(Destination,Reps,Source,PRTType,Mult,Offset)
PRTCalc(Deg_C,1,Rs_Ro,1,1.0,0)
NextScan
EndProg
7.8.18.2.4 PT100 in Four-Wire Full-Bridge
Example Shows:
How to measure a PRT in a four-wire full-bridge
Advantages:
Uses half as many input channels as four-wire half-bridge.
Example PRT Specifications:
Alpha = 0.00392 (PRTType 2)
This example measures a 100 ohm PRT in a four-wire full-bridge, as shown in
figure PT100 in Four-Wire Full-Bridge
(p. 268), using CRBasic instruction
BRFull(). In this example, the PRT is in a constant-temperature bath and the
measurement is to be used as the input for a control algorithm.
As described in table Resistive Bridge Measurements with Voltage Excitation (p.
300
), the result of BRFull() is X,
X=1000V
S
/V
X
Zobrazit stránku 265
1 2 ... 261 262 263 264 265 266 267 268 269 270 271 ... 589 590

Komentáře k této Příručce

Žádné komentáře