Campbell-scientific CR1000 Measurement and Control System Uživatelský manuál Strana 261

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 588
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 260
Section 7. Installation
261
Figure 80: PT100 in three-wire half-bridge
CRBasicExample60. PT100inThreewireHalfbridge
'See FIGURE. PT100 in Three-Wire Half-Bridge (p. 260) for wiring diagram.
Public Rs_Ro
Public Deg_C
BeginProg
Scan(1,Sec,0,0)
'BrHalf3W(Dest,Reps,Range1,SEChan,ExChan,MPE,Ex_mV,True,0,250,100.93,0)
BrHalf3W(Rs_Ro,1,mV25,1,Vx1,1,2200,True,0,250,100.93,0)
'PRTCalc(Destination,Reps,Source,PRTType,Mult,Offset)
PRTCalc(Deg_C,1,Rs_Ro,1,1.0,0)
NextScan
EndProg
7.8.18.2.4 PT100 in Four-Wire Full-Bridge
Example Shows:
How to measure a PRT in a four-wire full-bridge
Advantages:
Uses half as many input channels as four-wire half-bridge.
Example PRT Specifications:
Alpha = 0.00392 (PRTType 2)
This example measures a 100 ohm PRT in a four-wire full-bridge, as shown in
figure PT100 in Four-Wire Full-Bridge
(p. 263), using CRBasic instruction
BRFull(). In this example, the PRT is in a constant-temperature bath and the
measurement is to be used as the input for a control algorithm.
As described in table Resistive Bridge Measurements with Voltage Excitation (p.
296
), the result of BRFull() is X,
X=1000V
S
/V
X
Zobrazit stránku 260
1 2 ... 256 257 258 259 260 261 262 263 264 265 266 ... 587 588

Komentáře k této Příručce

Žádné komentáře