UT20 and UT30 Tower-based Weather Stations
8.1.2 CR1000 Datalogger
The CR1000 datalogger and PS100 12 V power supply mount to the enclosure
backplate as shown in FIGURE 8-5. Two screws (pn 447) attach the CR1000,
four screws (pn 505) attach the PS100.
8.1.3 BPALK Alkaline Power Supply
The BPALK battery pack houses eight alkaline “D” cell batteries (FIGURE
8-4). To install the batteries, loosen the thumb screw and remove the cover.
1. Make sure the red and black wires attached to the left end of the BPALK
are connected to the “12 V” and “G” terminals on the CR1000.
2. Disconnect the battery pack from the external connector on the left end of
the BPALK. Remove the battery pack and insert eight alkaline “D” cell
batteries. Replace the battery pack.
3. Connect the battery pack to the external connector labeled “INTERNAL
BATTERY” and replace the cover.
8.1.4 PS100 Rechargeable Power Supply
The PS100 houses a sealed monoblock rechargeable battery. To install the
battery, loosen the two thumb screws and remove the cover.
1. With the PS100 power switch OFF, insert the battery and plug the
battery lead into the connector labeled INT”.
2. Make sure the red and black wires attached to the +12 Vand
terminals on the PS100 are connected to the 12 Vand “G” terminals on
the CR1000 Wiring Panel.
3. An AC transformer or unregulated solar panel (Section 8.1.5, SP10 Solar
Panel) should be connected to the PS100 at all times. Connect the lead
wires from the transformer or solar panel without regard to polarity to the
two terminals labeled CHG” (FIGURE 8-5); the red LED should light
when voltage is present.
The wall transformer converts 120 Vac input to 18 Vac output.
Maximum charging current is 1.1 A.
Maximum input voltage into the CHGterminals is 26
Vac or 26 Vdc. Do not connect 110 Vac directly to
CHGterminals.
4. Turn power switch to ON, and replace cover.
NOTE
WARNING
23
Zobrazit stránku 32